How to clean the glue filling machine
2025-05-06 08:56:28
times

Brush glue machine contains a clean key first role, then the actual operation is very simple, press the positioning key, the equipment can be carried out. The strong glue discharge, and then the organic, such as rosin industrial alcohol, solution loaded in the equipment; it will be this organic solution and strong glue pressed in together, and then blow up with a cleaner can be. Cleaning is very necessary, handy, not used for a long time, strong adhesive dry solid in the glue valve, it is likely not the barrel on the poop, it is likely that there are some spare parts will need to be dismantled and replaced.


  There are some customers will ask that other places do not clean will not block it? This is impossible, because the automatic glue filling machine, B glue is separated, AB glue touch before drying solid glue machine powerful glue from A barrel, B barrel out, its touch position is at the suction tube, with the crazy crazy growth, the function of mixing and tube within the centrifugal impeller AB latex breast milk and mixing, so touching touch on the location of the precise, other areas do not have to touch the place to focus on not easy to dry solid stuffed with the symptoms! And automatic glue filling and closing of the tube is very good, with the role of the test pressure, so that is, you are not in the middle of the glue, the equipment is put in place, will also be easy to touch with the oral cavity, is not easy to produce chemical changes, put a few days and then use it, in general, it is not a problem. To the problem is the gate valve failure, leading to deal with the application of the glue valve often the cause of the problem


  1, the glue valve leakage situation often arises in the glue valve off. 95% of the cases are due to the application of the needle specification is too small. As a result, the valve did not leak after the glue off, outdated needles may jeopardize the glue valve is about to be applied when the exhaust bubble posture, it is very easy to change the needle to deal with this kind of problem. Side type needle caused by back pressure type, * less air flow zui smooth. Or first will be the gum centrifugal defoaming in the application.

  2, the glue particles nozzle when out of the glue outlet when the key for the pressure stored in the liquid or pressure to launch the supply provided by the set of mouth pressure variable pressure gauge. 1015psi, the pressure applied by the pressure cylinder should be controlled to change the pressure gauge right in the middle of the pressure, should prevent the application of the pressure gauge appears to be at a low pressure. . If Crewe 15/1000 seconds will lead to unstable glue, the longer the glue time out of the glue more slowly.

  4, vapor bubbles within the liquid too much liquid pressure if over the open valve may cause time, the solution is to reduce the liquid pressure and the application of cone side type needle.

  5, quick-drying glue (instant glue) in the glue valve `connector ` and pipeline on an event situation causes behind the moisture or many times reused quick-drying glue, should be applied to fresh quick-drying glue, will filter pipeline to do not contain the bottom layer of wet acetone in the thoroughly cleaned, the application of the breath should be shown that may be dry booming and the air pressure and glue valve system software installed between. Apply N2.)

  6, ultraviolet glue (ultraviolet light dry curing adhesive) obvious application of gray and black pipe. Do not immediately join the UV glue in the pressure cylinder old UV glue, first the original UV glue drain, and then UV glue poured into the empty glue on the pressure cylinder, the pressure cylinder UV glue usually calendar after the formation of vapor bubbles and lead to out of the glue stabilization.

  7, the head is generally said to be more than the side of the 20-gauge needle may cause the diversion of the needle - leakage or drooping needle, the general application of large general metal materials head or cone-type needles to prevent the application of winding or Teflon needles.

  8, high glue (expoxy) cleaning may have to talk a once converted with a general two organic solvents storage pressure driving once, the cure is often tracked!